Price for "Seattle Healthcare Support & Staff Areas — Clean/Soiled Utility, EVS & Workflow"
|
Project & Assessments
|
|
|---|---|
| Lighting analysis and recommendations | from $800 |
| Acoustic assessment for staff areas | from $850 |
| Healthcare facility code compliance review | from $900 |
| HVAC system preliminary design review | from $950 |
| Budget estimation and scheduling | from $950 |
| Preliminary design consultation | from $1000 |
| Structural assessment of existing support areas | from $1050 |
| Environmental impact assessment | from $1100 |
| Site analysis and feasibility study | from $1200 |
| Architectural programming and space planning | from $1300 |
|
Preparatory Works
|
|
| Temporary safety signage installation | from $400 |
| Underground utility locating and marking | from $900 |
| Site access preparation for construction vehicles | from $1000 |
| Temporary barriers and containment setup | from $1100 |
| Subgrade preparation and compaction | from $1300 |
| Soil testing and remediation | from $1400 |
| Site clearing and debris removal | from $1500 |
| Selective demolition of non-load-bearing partitions | from $1800 |
| Hazardous material identification and removal | from $2000 |
|
Structural & Carpentry
|
|
| Installation of handrail systems and guards | from $1600 |
| Door and frame installation for staff areas | from $1800 |
| Window framing and reinforcement | from $2000 |
| Framing of new partition walls | from $2200 |
| Custom cabinetry for break rooms and storage | from $2400 |
| Installation of mezzanine support structures | from $3500 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Fire alarm and emergency lighting installation | from $2800 |
| Electrical wiring and outlet installation | from $3000 |
| Plumbing rough-in for staff restrooms | from $3200 |
| Medical gas system installation support | from $4800 |
| Installation of healthcare-grade HVAC systems | from $5600 |
|
Finishes & Installations
|
|
| Window treatments and blinds installation | from $1200 |
| Installation of signage and wayfinding systems | from $1500 |
| Installation of wall protection panels | from $1900 |
| Painting and wall finishes | from $2100 |
| Acoustic ceiling tile installation | from $2300 |
| Installation of vinyl composition tile flooring | from $2600 |
|
Additional Services & Permitting
|
|
| Post-construction cleaning and wipe down | from $1000 |
| As-built documentation and record keeping | from $1100 |
| Final inspection coordination and support | from $1300 |
| Permitting and code documentation submission | from $1400 |
| Value engineering consultation | from $1800 |
| Construction project management and reporting | from $2200 |