Price for "Seattle Hotel Commercial Kitchens — Hoods, Grease, MEP & Finishes"
|
Project & Assessments
|
|
|---|---|
| Permit and code review consultation | from $500 |
| Waste management plan development | from $550 |
| Energy efficiency analysis | from $600 |
| Noise and ventilation impact study | from $600 |
| Accessibility compliance review | from $600 |
| Environmental impact evaluation | from $650 |
| Lighting design consultation | from $650 |
| Food safety compliance assessment | from $700 |
| Project scheduling and timeline setup | from $700 |
| Fire safety risk analysis | from $700 |
| Cost estimation and budgeting | from $750 |
| Site evaluation and feasibility study | from $800 |
| Conceptual kitchen layout planning | from $850 |
| Kitchen workflow design consultation | from $950 |
| Equipment specification and selection | from $1100 |
|
Preparatory Works
|
|
| Pest control and site treatment | from $400 |
| Delivery and staging area setup | from $600 |
| Temporary fencing and site security | from $750 |
| Temporary water and power setup | from $850 |
| Utility disconnection and protection | from $900 |
| Site clearing and debris removal | from $1200 |
| Subgrade soil compaction and testing | from $1300 |
| Demolition of existing kitchen structures | from $1800 |
| Excavation and foundation preparation | from $2500 |
|
Structural & Carpentry
|
|
| Ceiling framework installation | from $2200 |
| Drywall and moisture-resistant board installation | from $2700 |
| Wall partition construction | from $2800 |
| Floor framing reinforcement | from $2900 |
| Fire-rated door and window framing | from $3200 |
| Framing and structural supports installation | from $3500 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Water heater installation | from $2100 |
| Grease trap installation | from $2500 |
| Gas line installation and connection | from $2700 |
| Plumbing rough-in for sinks and drains | from $3300 |
| Commercial kitchen exhaust hood installation | from $3800 |
| Fire suppression system installation | from $3900 |
| Electrical panel upgrades and wiring | from $4100 |
| HVAC system design and installation | from $4500 |
|
Finishes & Installations
|
|
| Ventilation grills and registers installation | from $1800 |
| Lighting fixture installation | from $1900 |
| Painting and wall finishes | from $2200 |
| Wall tile and backsplash installation | from $2400 |
| Floor tile installation with slip resistance | from $2800 |
| Installation of stainless steel counters | from $3000 |
| Cabinetry and shelving setup | from $3100 |
| Equipment installation and alignment | from $3500 |
|
Additional Services & Permitting
|
|
| Waste disposal permits and documentation | from $650 |
| Post-construction maintenance planning | from $700 |
| Health department inspection facilitation | from $750 |
| Kitchen equipment inspection coordination | from $900 |
| Final cleaning and kitchen readiness check | from $1200 |
| Building permit application and follow-up | from $1500 |
| Project management and coordination | from $2800 |