Price for "Seattle Government Demolition & Site Work — Selective Demo & Groundwork"
|
Project & Assessments
|
|
|---|---|
| Community notification coordination | from $250 |
| Traffic and logistics planning | from $300 |
| Utility location and mapping | from $320 |
| Site evaluation and feasibility study | from $350 |
| Cost estimation and budgeting | from $350 |
| Permit and regulatory compliance review | from $380 |
| Structural integrity inspection | from $400 |
| Demolition plan development and approval | from $420 |
| Environmental impact assessment | from $450 |
| Hazardous materials survey (asbestos, lead, mold) | from $500 |
|
Preparatory Works
|
|
| Fencing and site protection setup | from $900 |
| Temporary erosion control installation | from $1100 |
| Dust and noise control measures | from $1150 |
| Site clearing and vegetation removal | from $1200 |
| Temporary access road construction | from $1250 |
| Debris removal and hauling | from $1300 |
| Drainage setup and water diversion | from $1350 |
| Selective demolition of non-structural elements | from $1400 |
| Site grading preparation | from $1500 |
|
Structural & Carpentry
|
|
| Salvage and recycling of materials | from $1800 |
| Wood framing demolition and disposal | from $2200 |
| Site debris clearing and compacting | from $2400 |
| Hand demolition for sensitive areas | from $2600 |
| Demolition of structural concrete and masonry | from $2800 |
| Load-bearing wall removal and shoring | from $3000 |
| Foundation excavation and removal | from $3100 |
| Steel frame dismantling and removal | from $3200 |
| Reinforced concrete cutting and removal | from $3500 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Water supply disconnection and isolation | from $850 |
| Electrical conduit removal | from $870 |
| Temporary power disconnection and capping | from $900 |
| Gas line shutdown and sealing | from $950 |
| Fire suppression system removal | from $950 |
| Sewer and storm drain removal | from $1000 |
| HVAC system dismantling and removal | from $1100 |
| Utility trench backfilling | from $1200 |
|
Finishes & Installations
|
|
| Temporary fencing removal | from $900 |
| Installation of erosion control blankets | from $1250 |
| Site survey and as-built documentation | from $1300 |
| Traffic sign and signal reinstallations | from $1350 |
| Site cleanup and final debris removal | from $1400 |
| Revegetation and landscaping prep | from $1450 |
| Restoration of adjacent paved areas | from $1600 |
| Soil remediation after demolition | from $2300 |
|
Additional Services & Permitting
|
|
| Municipal inspections facilitation | from $600 |
| Demolition permit procurement | from $700 |
| Community relations and conflict resolution | from $720 |
| Post-demolition reporting and certification | from $780 |
| Permit application and processing assistance | from $800 |
| Project scheduling and timeline management | from $850 |
| Waste disposal and hazardous materials documentation | from $900 |
| Environmental permitting coordination | from $950 |
| Safety plan development and supervision | from $950 |