Price for "Demolition & Site Work Services in Bellevue, WA"
|
Project & Assessments
|
|
|---|---|
| Community notification coordination | from $275 |
| Traffic and logistics planning | from $330 |
| Utility location and mapping | from $352 |
| Site evaluation and feasibility study | from $385 |
| Cost estimation and budgeting | from $385 |
| Permit and regulatory compliance review | from $418 |
| Structural integrity inspection | from $440 |
| Demolition plan development and approval | from $462 |
| Environmental impact assessment | from $495 |
| Hazardous materials survey (asbestos, lead, mold) | from $550 |
|
Preparatory Works
|
|
| Fencing and site protection setup | from $990 |
| Temporary erosion control installation | from $1210 |
| Dust and noise control measures | from $1265 |
| Site clearing and vegetation removal | from $1320 |
| Temporary access road construction | from $1375 |
| Debris removal and hauling | from $1430 |
| Drainage setup and water diversion | from $1485 |
| Selective demolition of non-structural elements | from $1540 |
| Site grading preparation | from $1650 |
|
Structural & Carpentry
|
|
| Salvage and recycling of materials | from $1980 |
| Wood framing demolition and disposal | from $2420 |
| Site debris clearing and compacting | from $2640 |
| Hand demolition for sensitive areas | from $2860 |
| Demolition of structural concrete and masonry | from $3080 |
| Load-bearing wall removal and shoring | from $3300 |
| Foundation excavation and removal | from $3410 |
| Steel frame dismantling and removal | from $3520 |
| Reinforced concrete cutting and removal | from $3850 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Water supply disconnection and isolation | from $935 |
| Electrical conduit removal | from $957 |
| Temporary power disconnection and capping | from $990 |
| Gas line shutdown and sealing | from $1045 |
| Fire suppression system removal | from $1045 |
| Sewer and storm drain removal | from $1100 |
| HVAC system dismantling and removal | from $1210 |
| Utility trench backfilling | from $1320 |
|
Finishes & Installations
|
|
| Temporary fencing removal | from $990 |
| Installation of erosion control blankets | from $1375 |
| Site survey and as-built documentation | from $1430 |
| Traffic sign and signal reinstallations | from $1485 |
| Site cleanup and final debris removal | from $1540 |
| Revegetation and landscaping prep | from $1595 |
| Restoration of adjacent paved areas | from $1760 |
| Soil remediation after demolition | from $2530 |
|
Additional Services & Permitting
|
|
| Municipal inspections facilitation | from $660 |
| Demolition permit procurement | from $770 |
| Community relations and conflict resolution | from $792 |
| Post-demolition reporting and certification | from $858 |
| Permit application and processing assistance | from $880 |
| Project scheduling and timeline management | from $935 |
| Waste disposal and hazardous materials documentation | from $990 |
| Environmental permitting coordination | from $1045 |
| Safety plan development and supervision | from $1045 |