Price for "Seattle University Library Construction — Quiet Zones, AV & Wayfinding"
|
Project & Assessments
|
|
|---|---|
| Cost estimation & budget planning | from $3000 |
| Building code compliance review | from $3200 |
| Permitting consultancy | from $3500 |
| Project scheduling & management plan | from $3800 |
| Geotechnical survey & analysis | from $4000 |
| Feasibility study & site analysis | from $4500 |
| Environmental impact study | from $5000 |
| 3D modeling & visualization services | from $5500 |
| Structural engineering assessment | from $6000 |
| Architectural design & planning | from $8000 |
|
Preparatory Works
|
|
| Temporary site fencing installation | from $1500 |
| Erosion control measures | from $1800 |
| Utility location & protection | from $2200 |
| Site clearing & grading preparation | from $2500 |
| Site surveying & staking | from $2700 |
| Temporary access road construction | from $3000 |
| Soil compaction & testing | from $3200 |
| Shoring & underpinning setup | from $6000 |
| Excavation & earthworks | from $7000 |
| Demolition of existing structures | from $8000 |
|
Structural & Carpentry
|
|
| Wood flooring substructure | from $6000 |
| Interior partition framing | from $6500 |
| Concrete slab finishing | from $7000 |
| Masonry wall construction | from $8500 |
| Carpentry framing services | from $9000 |
| Installation of load-bearing beams | from $9500 |
| Roof framing & installation | from $10000 |
| Structural steel welding | from $11000 |
| Concrete foundation pouring | from $12000 |
| Steel framing erection | from $15000 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Data & security cable installation | from $6000 |
| Lighting fixture installation | from $7000 |
| Backup generator connection | from $7500 |
| Energy management system setup | from $8500 |
| Mechanical ductwork & ventilation | from $8800 |
| Fire alarm & sprinkler system | from $9000 |
| Boiler & water heater installation | from $9500 |
| Plumbing rough-in installation | from $12000 |
| HVAC system design & installation | from $13000 |
| Electrical wiring & panel setup | from $14000 |
|
Finishes & Installations
|
|
| Signage mounting & braille signs | from $3200 |
| Acoustic panel installation | from $4800 |
| Furniture & shelving setup | from $5500 |
| Window & door fitting | from $6000 |
| Interior painting & wall treatments | from $6500 |
| Ceiling tile & grid installation | from $7000 |
| Drywall installation & finishing | from $8000 |
| Flooring installation (carpet, tile, wood) | from $9000 |
| Cabinetry & millwork installation | from $11000 |
| Elevator & escalator installation | from $14000 |
|
Additional Services & Permitting
|
|
| Waste management & recycling | from $2700 |
| Project closeout coordination | from $3100 |
| Warranty management & service | from $3200 |
| As-built documentation & reporting | from $3500 |
| Post-construction site cleanup | from $3500 |
| Permit acquisition & processing | from $4000 |
| Construction site safety management | from $4500 |
| Quality control inspections | from $5000 |
| Commissioning & testing services | from $6000 |
| LEED certification consulting | from $7000 |