Price for "School Cafeteria Construction in Tacoma, WA"
|
Project & Assessments
|
|
|---|---|
| Health and safety compliance review | from $1800 |
| Permit application preparation support | from $2250 |
| Cost estimation and budgeting | from $2700 |
| Equipment capacity planning | from $2880 |
| Project scheduling and timeline development | from $3150 |
| Site feasibility study and consultation | from $3600 |
| Sustainability consultation and recommendations | from $4050 |
| Environmental impact analysis | from $5400 |
| Structural assessment and engineering reports | from $6300 |
| Architectural design and layout planning | from $7650 |
|
Preparatory Works
|
|
| Surveying and staking | from $2430 |
| Temporary utilities setup | from $2700 |
| Soil testing and compaction | from $2970 |
| Erosion control and site drainage | from $3240 |
| Selective demolition and debris removal | from $3420 |
| Site clearing and grading | from $3600 |
| Access roads and staging areas establishment | from $3690 |
| Foundation preparation and layout | from $4500 |
| Earthworks and excavation | from $6480 |
|
Structural & Carpentry
|
|
| Window and door framing | from $4050 |
| Metal stud framing for interior walls | from $4320 |
| Structural reinforcements and bracing | from $5580 |
| Mezzanine or elevated platform construction | from $6120 |
| Roof truss installation | from $7830 |
| Wall framing and sheathing | from $8460 |
| Concrete foundations and footings | from $8550 |
| Wood framing and carpentry work | from $10350 |
| Steel framing erection | from $12600 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Gas line installation and connections | from $5760 |
| Lighting design and installation | from $6210 |
| Water heater and boiler setup | from $6480 |
| Energy management system integration | from $6930 |
| Fire suppression system installation | from $7200 |
| Kitchen exhaust hood and ventilation | from $9900 |
| Plumbing and grease trap installation | from $11250 |
| Electrical wiring and panel setup | from $12600 |
| HVAC system design and installation | from $14400 |
|
Finishes & Installations
|
|
| Window treatments and blinds | from $2430 |
| Waste disposal and recycling stations | from $4320 |
| Storage shelving and cabinetry | from $4860 |
| Food service counters and stations | from $5580 |
| Ceiling installation and acoustic treatments | from $5850 |
| Seating area installation and furniture | from $6300 |
| Wall paneling and painting | from $6390 |
| Flooring installation (tile and rubber flooring) | from $7470 |
| Stainless steel kitchen equipment installation | from $8820 |
|
Additional Services & Permitting
|
|
| Warranty management and support | from $1980 |
| Post-construction maintenance planning | from $2070 |
| Project closeout and final reporting | from $2250 |
| Inspection coordination and documentation | from $2520 |
| As-built drawings and documentation | from $2610 |
| Equipment commissioning and training | from $2700 |
| Zoning and code compliance consulting | from $2880 |
| Building permit application and fees | from $3150 |
| Environmental certification assistance | from $3690 |