Price for "Seattle X-Ray Room Construction — Lead Shielding & Controls"
|
Project & Assessments
|
|
|---|---|
| Site analysis and feasibility study | from $800 |
| Radiation safety officer consultation | from $850 |
| Environmental impact evaluation | from $900 |
| X-ray room layout planning | from $1000 |
| Safety compliance audit | from $1000 |
| Lead lining thickness calculation | from $1100 |
| Radiation shielding design consultation | from $1200 |
| Shielding material specification report | from $1300 |
| Structural engineering assessment for shielding | from $1500 |
|
Preparatory Works
|
|
| Debris hauling and disposal | from $1200 |
| Site clearing and preparation | from $1500 |
| Wall surface preparation for lead lining | from $1600 |
| Floor reinforcement preparation | from $1800 |
| Demolition and removal of existing structures | from $2000 |
| Temporary containment setup for radiation work | from $2200 |
|
Structural & Carpentry
|
|
| Door and window shield framing | from $2500 |
| Installation of structural framing | from $3500 |
| Ceiling grid and panels with radiation shielding | from $3700 |
| Structural reinforcement for shielding walls | from $3900 |
| Lead-lined drywall installation | from $4000 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Plumbing work for lead-lined sinks and drainage | from $2500 |
| Lighting installation compliant with radiation shielding | from $2700 |
| Installation of X-ray equipment electrical wiring | from $2800 |
| HVAC adjustments for radiation safety | from $3000 |
| Emergency power system integration | from $3200 |
|
Finishes & Installations
|
|
| Ceiling tile finishing and sealing | from $2000 |
| Floor covering installation with shielding properties | from $2100 |
| Wall finishes with radiation-resistant paint | from $2300 |
| Radiation shielding door installation | from $2900 |
| Lead glass window installation | from $3500 |
|
Additional Services & Permitting
|
|
| Inspection coordination and certification | from $1300 |
| Permit application processing | from $1500 |
| Radiation shielding commissioning report | from $1600 |
| Post-construction radiation survey | from $1800 |
| Project management and oversight | from $2200 |