Price for "Duplex Condo Construction in Bellevue, WA"
|
Project & Assessments
|
|
|---|---|
| Site evaluation and feasibility study | from $880 |
| Permit application assistance | from $990 |
| Zoning compliance review | from $1045 |
| Utility connection planning | from $1100 |
| Energy efficiency consultation | from $1210 |
| Construction budgeting and cost estimation | from $1320 |
| Landscape design planning | from $1540 |
| Soil testing and geotechnical report | from $1650 |
| Environmental impact assessment | from $1980 |
| 3D modeling and renderings | from $2420 |
| Structural engineering assessment | from $3520 |
| Architectural design and planning | from $4950 |
|
Preparatory Works
|
|
| Temporary fencing and site security | from $1320 |
| Erosion control setup | from $1430 |
| Soil stabilization | from $1980 |
| Site clearing and debris removal | from $2200 |
| Foundation site preparation | from $2750 |
| Excavation and grading | from $4950 |
|
Structural & Carpentry
|
|
| Window and door framing | from $4400 |
| Exterior wall sheathing and wrap | from $6600 |
| Deck and balcony framing | from $7700 |
| Roof framing and sheathing | from $9350 |
| Foundation pouring and curing | from $13200 |
| Framing carpentry | from $16500 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Gas line installation | from $3520 |
| Fire sprinkler system installation | from $4400 |
| Plumbing rough-in and piping | from $7480 |
| Electrical wiring and panel setup | from $8250 |
| HVAC system installation | from $9900 |
|
Finishes & Installations
|
|
| Lighting fixtures installation | from $2420 |
| Bathroom fixture installation | from $3850 |
| Interior painting and priming | from $5500 |
| Cabinet and countertop installation | from $7150 |
| Flooring installation (hardwood, tile) | from $7700 |
| Drywall installation and finishing | from $8800 |
|
Additional Services & Permitting
|
|
| Building permit processing | from $990 |
| Final inspection coordination | from $1430 |
| As-built drawings preparation | from $1650 |
| Waste disposal and recycling | from $1980 |
| Post-construction cleaning | from $2420 |
| Construction management and supervision | from $4400 |