Price for "Community Center Construction in Bellevue, WA"
|
Project & Assessments
|
|
|---|---|
| Community needs consultation | from $660 |
| Permit application assistance | from $770 |
| Accessibility compliance review | from $825 |
| Site analysis and feasibility study | from $880 |
| Cost estimation and budgeting | from $990 |
| Environmental impact assessment | from $1320 |
| Structural engineering assessment | from $1650 |
| 3D modeling and visualization | from $1980 |
| Architectural design and planning | from $3850 |
|
Preparatory Works
|
|
| Utility disconnection and marking | from $990 |
| Temporary fencing installation | from $1320 |
| Erosion and sediment control setup | from $1760 |
| Site clearing and debris removal | from $2200 |
| Subgrade preparation and compaction | from $3300 |
| Demolition of existing structures | from $4400 |
|
Structural & Carpentry
|
|
| Rough carpentry adjustments | from $3080 |
| Exterior sheathing and weatherproofing | from $3520 |
| Floor decking and joist work | from $5280 |
| Beam and column installation | from $7150 |
| Foundation installation and inspection | from $7700 |
| Framing of walls and roof | from $9350 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Energy-efficient lighting setup | from $3190 |
| Gas line installation and testing | from $3410 |
| Fire protection system installation | from $4620 |
| Plumbing rough-in and fixtures | from $6380 |
| Electrical wiring and panels | from $7150 |
| HVAC system design and installation | from $10450 |
|
Finishes & Installations
|
|
| Interior painting and priming | from $2970 |
| Drywall installation and finishing | from $3960 |
| Acoustic ceiling installation | from $4180 |
| Window and door installation | from $4400 |
| Cabinetry and millwork | from $4950 |
| Flooring installation (tile/wood/carpet) | from $5940 |
|
Additional Services & Permitting
|
|
| As-built documentation | from $990 |
| Post-construction inspection | from $1210 |
| Site cleanup and waste disposal | from $1430 |
| Construction permit procurement | from $1650 |
| LEED certification consultation | from $2200 |
| Project management and scheduling | from $2420 |