Project & Assessments
|
|
|---|---|
| Acoustic assessment for noise control | from $990 |
| Energy efficiency planning | from $1100 |
| Hazardous materials risk assessment | from $1210 |
| Laboratory space planning & feasibility study | from $1320 |
| Lighting and ventilation analysis | from $1320 |
| Laboratory workflow design consultation | from $1430 |
| Lab safety compliance review | from $1430 |
| Structural integrity evaluation | from $1540 |
| Site survey & soil testing | from $1650 |
| Environmental impact assessment | from $1980 |
|
Preparatory Works
|
|
| Temporary fencing & security setup | from $1650 |
| Utility mark-out and site prep | from $1980 |
| Site clearing & debris removal | from $2200 |
| Ground leveling and grading | from $2750 |
| Asbestos and hazardous material abatement | from $3300 |
| Excavation for foundation | from $4400 |
|
Structural & Carpentry
|
|
| Steel door fitting with lab seals | from $3850 |
| Interior partition framing | from $4400 |
| Microporous wall panel installation | from $5280 |
| Custom laboratory bench construction | from $6050 |
| Concrete foundation pouring | from $7150 |
| Roof framing and waterproofing | from $7920 |
| Steel framing erection | from $11000 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Electrical wiring with surge protection | from $7700 |
| Fire suppression system setup | from $8250 |
| Specialized plumbing for chemical waste | from $8800 |
| Emergency power generator installation | from $9900 |
| Clean room air filtration setup | from $10450 |
| HVAC system installation for lab environment | from $13200 |
|
Finishes & Installations
|
|
| Laboratory lighting fixtures installation | from $3850 |
| Durable lab-grade wall finishes | from $4620 |
| Lab furniture setup and calibration | from $4950 |
| Anti-static flooring installation | from $5500 |
| Chemical-resistant countertop installation | from $6600 |
|
Additional Services & Permitting
|
|
| Waste disposal plan development | from $1980 |
| Environmental compliance documentation | from $2200 |
| Post-construction safety audit | from $2420 |
| Permitting and regulatory approval services | from $2750 |
| Custom lab equipment installation consultation | from $2970 |
| Project management and coordination | from $3300 |