Price for "Building Systems Installation and Maintenance in Tacoma, WA"
|
Project & Assessments
|
|
|---|---|
| Lighting design consultation | from $495 |
| Energy efficiency assessment | from $540 |
| Accessibility audit and recommendations | from $585 |
| Site survey and feasibility study | from $630 |
| Soil testing and geotechnical report | from $675 |
| Environmental impact evaluation | from $720 |
| Building code compliance review | from $810 |
| Cost estimation and budgeting | from $990 |
| Structural engineering analysis | from $1620 |
| Architectural design and planning | from $2250 |
|
Preparatory Works
|
|
| Temporary site fencing installation | from $810 |
| Dust control and erosion prevention | from $855 |
| Temporary power and water supply setup | from $1080 |
| Site clearing and debris removal | from $1170 |
| Utility connection preparation | from $1350 |
| Concrete formwork and pouring prep | from $1530 |
| Demolition of existing structures | from $1800 |
| Earthwork and grading | from $1980 |
| Excavation for foundations | from $2520 |
|
Structural & Carpentry
|
|
| Fireproofing structural elements | from $2520 |
| Metal deck installation | from $2700 |
| Floor system framing | from $3060 |
| Roof truss assembly and installation | from $3330 |
| Wall sheathing and exterior framing | from $3510 |
| Wood framing and carpentry | from $4140 |
| Steel framing and installation | from $4680 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Gas line installation for kitchen equipment | from $2880 |
| Sprinkler system installation | from $3420 |
| Plumbing rough-in work | from $4140 |
| Commercial kitchen exhaust system | from $4320 |
| Electrical wiring and panel installation | from $4500 |
| HVAC system design and installation | from $4950 |
|
Finishes & Installations
|
|
| Lighting fixture installation | from $1710 |
| Bathroom fixture installation | from $1890 |
| Ceiling system installation | from $2070 |
| Interior wall finishing and painting | from $2250 |
| Floor covering installation (tile/vinyl) | from $2430 |
| Door and window installation | from $2520 |
| Millwork and cabinetry installation | from $3150 |
|
Additional Services & Permitting
|
|
| Post-construction cleaning | from $1080 |
| Construction site safety management | from $1170 |
| As-built documentation and reporting | from $1260 |
| Quality control inspections | from $1350 |
| Permit procurement and processing | from $1440 |
| Project scheduling and coordination | from $1710 |
| Facility commissioning and training | from $1800 |