Price for "Temple Construction in Tacoma, WA"
|
Project & Assessments
|
|
|---|---|
| Permit application assistance | from $630 |
| Site feasibility study | from $720 |
| Surveying and site mapping | from $765 |
| Cost estimation and budgeting | from $810 |
| Soil testing and analysis | from $855 |
| Geotechnical survey | from $900 |
| 3D modeling and visualization | from $990 |
| Architectural design consultation | from $1080 |
| Environmental impact analysis | from $1170 |
| Structural engineering assessment | from $1350 |
|
Preparatory Works
|
|
| Temporary fencing installation | from $540 |
| Foundation layout marking | from $810 |
| Utility disconnect and protection | from $1080 |
| Trenching for utilities | from $1260 |
| Erosion control measures | from $1440 |
| Site drainage preparation | from $1620 |
| Site clearing and grading | from $1800 |
| Demolition of existing structures | from $2250 |
| Excavation and earthworks | from $3150 |
|
Structural & Carpentry
|
|
| Window and door framing | from $1890 |
| Exterior sheathing application | from $2070 |
| Deck and porch framing | from $2430 |
| Structural repairs and reinforcement | from $2610 |
| Floor framing and joist installation | from $2880 |
| Wall framing installation | from $3420 |
| Roof framing and sheathing | from $3600 |
| Concrete foundation pouring | from $4050 |
| Structural framing and carpentry | from $4680 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Water heater installation | from $1530 |
| Lighting fixture installation | from $1710 |
| Electrical panel upgrade | from $2250 |
| Gas line installation | from $2520 |
| Energy-efficient system integration | from $2610 |
| Fire sprinkler system setup | from $2790 |
| Plumbing rough-in | from $3060 |
| Electrical wiring and outlets | from $3330 |
| HVAC system installation | from $3780 |
|
Finishes & Installations
|
|
| Trim and molding work | from $1980 |
| Bathroom fixture installation | from $2160 |
| Painting and wall treatments | from $2340 |
| Cabinet and millwork installation | from $2610 |
| Window and door installation | from $2790 |
| Drywall installation and finishing | from $2880 |
| Exterior siding installation | from $2970 |
| Flooring installation (hardwood, tile) | from $3150 |
| Roofing and gutter installation | from $3420 |
|
Additional Services & Permitting
|
|
| Waste disposal and recycling | from $810 |
| Change order management | from $900 |
| Safety plan development | from $990 |
| Post-construction cleaning | from $1080 |
| Energy code compliance review | from $1170 |
| As-built documentation | from $1260 |
| Permit coordination and inspections | from $1350 |
| Quality assurance inspections | from $1440 |
| Project scheduling and monitoring | from $1620 |
| Construction management services | from $2430 |