Price for "ICU Room Construction in Tacoma, WA"
|
Project & Assessments
|
|
|---|---|
| Initial feasibility study and site assessment | from $1080 |
| Budget estimation and project timeline setup | from $1350 |
| Permitting consultation and documentation review | from $1440 |
| Risk assessment and mitigation planning | from $1620 |
| Construction phasing plan development | from $1800 |
| Environmental impact assessment | from $1980 |
| ICU-specific code compliance review | from $2250 |
| Structural engineering consultation | from $3420 |
| MEP system preliminary design | from $3690 |
| Architectural design and layout planning | from $4050 |
|
Preparatory Works
|
|
| Site surveying and stakeout | from $900 |
| Temporary fencing and safety barriers installation | from $1080 |
| Traffic management plan implementation | from $1170 |
| Utility location and disconnection | from $1260 |
| Temporary power and water connection setup | from $1350 |
| Site drainage and erosion control setup | from $1620 |
| Hazardous material removal and disposal | from $2250 |
| Site clearing and earthwork preparation | from $2880 |
| Base slab excavation and preparation | from $2970 |
|
Structural & Carpentry
|
|
| Structural inspections and quality control | from $2430 |
| Door frames and hardware installation | from $2790 |
| Wall insulation and vapor barrier installation | from $3510 |
| Windows installation with soundproof glass | from $3780 |
| Ceiling grid installation for medical equipment | from $6480 |
| Interior partition framing with fire-rated materials | from $7020 |
| Concrete foundation pouring and curing | from $8370 |
| Steel framing erection for ICU walls | from $11250 |
| Installation of lead-lined walls for radiation protection | from $13050 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Data network and communication wiring | from $4050 |
| Nurse call system wiring and testing | from $4680 |
| System commissioning and performance testing | from $5400 |
| Fire suppression system installation | from $6030 |
| Plumbing fixtures including hands-free sinks and toilets | from $7650 |
| Electrical wiring for ICU-grade outlets and lighting | from $11250 |
| Medical gas piping installation | from $12600 |
| HVAC system installation with HEPA filtration | from $14400 |
| Emergency power supply and backup generator setup | from $16200 |
|
Finishes & Installations
|
|
| Final cleaning and debris removal | from $2250 |
| Blind and curtain track installation | from $2340 |
| Wall-mounted storage cabinets installation | from $3060 |
| Painting with hospital-grade antimicrobial coatings | from $3330 |
| Installation of assistive medical equipment mounts | from $4320 |
| Lighting fixture installation compliant with ICU specs | from $4680 |
| Antimicrobial wall panel installation | from $5040 |
| Specialized flooring installation for ICU hygiene | from $6390 |
| Ceiling-mounted patient lifts installation | from $8460 |
|
Additional Services & Permitting
|
|
| Post-construction maintenance planning | from $1440 |
| Project closeout and client training | from $1710 |
| Warranty and service contract preparation | from $1890 |
| As-built documentation and drawings | from $1980 |
| Inspections coordination and documentation | from $2520 |
| Building permit application management | from $2700 |