Price for "Front Desk Construction in Bellevue, WA"
|
Project & Assessments
|
|
|---|---|
| Initial design consultation | from $275 |
| Site survey and assessment | from $330 |
| Permit application assistance | from $385 |
| Feasibility study and budgeting | from $440 |
| Interior design planning | from $495 |
| Concept design development | from $550 |
| Accessibility compliance review | from $550 |
| Environmental impact evaluation | from $605 |
| Detailed architectural drawings | from $660 |
| Structural engineering analysis | from $770 |
|
Preparatory Works
|
|
| Temporary fencing and safety barriers | from $660 |
| Temporary utilities setup | from $715 |
| Erosion and sediment control | from $770 |
| Subsurface investigation | from $770 |
| Debris removal and disposal | from $825 |
| Site clearing and preparation | from $880 |
| Site grading and leveling | from $990 |
| Selective demolition of existing structures | from $1320 |
|
Structural & Carpentry
|
|
| Door frame installation | from $1210 |
| Drywall installation and finishing | from $1320 |
| Window framing and rough opening | from $1430 |
| Framing of new walls and partitions | from $1650 |
| Floor joists and subfloor installation | from $1980 |
| Concrete slab pouring and finishing | from $2200 |
| Installation of structural beams | from $2750 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Lighting system installation | from $1760 |
| Fire protection system installation | from $1980 |
| Plumbing rough-in and fixture installation | from $2420 |
| Electrical wiring and panel upgrades | from $2750 |
| HVAC system design and installation | from $3300 |
|
Finishes & Installations
|
|
| Painting and wall finishes | from $1540 |
| Ceiling installation and treatments | from $1760 |
| Glass and glazing works | from $1870 |
| Lobby furniture and fixture installation | from $1980 |
| Cabinetry and millwork installation | from $2200 |
| Flooring installation (tile, wood, carpet) | from $2420 |
|
Additional Services & Permitting
|
|
| As-built documentation and reporting | from $660 |
| Quality assurance and final walkthrough | from $770 |
| Post-construction cleaning and waste removal | from $880 |
| Permit procurement and inspection coordination | from $990 |
| Project management and supervision | from $1650 |