Price for "Hardwood Floor Removal in Bellevue, WA"
|
Project & Assessments
|
|
|---|---|
| Initial site inspection and condition assessment | from $110 |
| Project timeline and cost estimate preparation | from $121 |
| Material waste disposal planning | from $132 |
| Environmental impact and recycling consultation | from $138 |
| Moisture content testing of subfloor | from $143 |
| Subfloor sound insulation assessment | from $149 |
| Pre-removal floor damage evaluation | from $154 |
| Safety and hazard assessment for removal | from $160 |
| Hardwood floor removal feasibility study | from $165 |
| Floor leveling and flatness survey | from $176 |
|
Preparatory Works
|
|
| Furniture removal and area protection | from $220 |
| Dust containment setup and protection barriers | from $242 |
| Temporary ventilation setup for dust control | from $275 |
| Protective masking for walls and fixtures | from $303 |
| Debris collection and haul-away | from $330 |
| Nail and staple removal from subfloor | from $385 |
| Subfloor cleaning and surface preparation | from $413 |
| Carpet and adhesive removal preparation | from $440 |
| Old floorboard patching and surface repair | from $462 |
| Old hardwood floor selective removal | from $935 |
|
Structural & Carpentry
|
|
| Work area structural cleanup | from $330 |
| Sanding and smoothing wooden substrate | from $550 |
| Minor drywall and baseboard repairs due to removal | from $605 |
| Subfloor inspection and joist reinforcement | from $660 |
| Edge trim and threshold carpentry | from $715 |
| Installation of additional wood supports | from $770 |
| Frame and joist realignment | from $825 |
| Staircase tread and nosing repair | from $990 |
| Subfloor replacement and leveling | from $1320 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Electrical circuit safety check | from $880 |
| Temporary power disconnection and reconnection | from $935 |
| Pipe insulation removal for floor access | from $957 |
| Relocation of electrical outlets and wiring near floor | from $990 |
| HVAC duct protection during floor removal | from $1045 |
| Adjustment and sealing of plumbing vents | from $1155 |
| Removal and reinstallation of baseboard heating | from $1210 |
| Underfloor heating system inspection | from $1430 |
|
Finishes & Installations
|
|
| Subfloor vapor barrier installation | from $495 |
| Sanding and finishing preparation | from $550 |
| Nail and screw fastening of subfloor planks | from $605 |
| New hardwood flooring installation preparation | from $660 |
| Moisture mitigation and sealing | from $660 |
| Floor leveling compound application | from $715 |
| Transition strips and moldings installation | from $770 |
| Installation of soundproof underlayment | from $770 |
|
Additional Services & Permitting
|
|
| Extended warranty and service contract options | from $220 |
| Project progress reporting | from $275 |
| Permit application and processing | from $330 |
| Consultation on hardwood recycling and reuse | from $330 |
| Post-removal site inspection and certification | from $385 |
| Waste disposal and environmental compliance | from $440 |
| Additional demolition beyond scope | from $660 |
| Emergency removal and repair services | from $880 |