Price for "Site Preparation Services in Bellevue, WA"
|
Project & Assessments
|
|
|---|---|
| Utility locates and markouts | from $660 |
| Site survey and feasibility study | from $880 |
| Budget estimation and cost analysis | from $935 |
| Site risk assessment and reporting | from $990 |
| Permitting consultation and document preparation | from $1100 |
| Constructability review for educational sites | from $1210 |
| Topographic mapping and analysis | from $1320 |
| Geotechnical investigation | from $1650 |
| Environmental impact assessment | from $2200 |
|
Preparatory Works
|
|
| Temporary fencing and barricades | from $1650 |
| Tree protection and pruning | from $1980 |
| Soil testing and remediation | from $2200 |
| Erosion and sediment control installation | from $2420 |
| Site clearing and debris removal | from $2750 |
| Access road preparation | from $3300 |
| Site grading and leveling | from $3850 |
|
Structural & Carpentry
|
|
| Temporary shoring and bracing | from $3080 |
| Deck and platform carpentry | from $3850 |
| Formwork installation for foundations | from $4400 |
| Structural framing for outdoor structures | from $4620 |
| Concrete footings and slab preparation | from $4950 |
| Installation of retaining walls | from $5500 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Temporary power setup and distribution | from $1980 |
| Site lighting installation | from $2970 |
| Plumbing stub-outs and connections | from $3520 |
| Mechanical system rough-ins | from $3850 |
| Site drainage and stormwater management | from $4400 |
|
Finishes & Installations
|
|
| Installation of signage and safety decals | from $1430 |
| Temporary barriers and protective finishes | from $1650 |
| Surface preparation and site cleanup | from $2200 |
|
Additional Services & Permitting
|
|
| Site inspection coordination | from $1100 |
| Permit application processing | from $1320 |
| Construction schedule management | from $1540 |