Price for "Vinyl Flooring Installation in Bellevue, WA"
|
Project & Assessments
|
|
|---|---|
| Permit application support | from $110 |
| Initial site inspection and consultation | from $132 |
| Contractor coordination | from $143 |
| Final project report and approval | from $154 |
| Material selection assistance | from $165 |
| Existing floor condition report | from $176 |
| Moisture and subfloor evaluation | from $198 |
| Budget estimation and timeline planning | from $220 |
| Design and layout planning | from $242 |
| Detailed flooring project assessment | from $275 |
|
Preparatory Works
|
|
| Old baseboard removal | from $165 |
| Protective floor covering installation | from $220 |
| Floor surface cleaning and preparation | from $242 |
| Subfloor drying and curing | from $275 |
| Surface moisture barrier installation | from $330 |
| Minor demolition and debris hauling | from $385 |
| Remove existing vinyl flooring | from $440 |
| Subfloor leveling and patching | from $495 |
|
Structural & Carpentry
|
|
| Baseboard replacement and finishing | from $330 |
| Custom vinyl floor molding installation | from $352 |
| Custom threshold and trim carpentry | from $385 |
| Vinyl floor transitions installation | from $440 |
| Subfloor repair and reinforcement | from $550 |
| Floor joist inspection and repair | from $660 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Plumbing fixture protection during work | from $198 |
| Ventilation system check and adjustment | from $330 |
| Electrical outlet and switch relocation | from $495 |
| Waterproofing membrane installation | from $770 |
| Relocation of plumbing lines if required | from $880 |
| Installation of floor heating system | from $1320 |
|
Finishes & Installations
|
|
| Floor protection until project completion | from $110 |
| Final cleaning and polish | from $165 |
| Trimming and fitting edges | from $275 |
| Installation of cove base molding | from $330 |
| Seam welding and finishing | from $385 |
| Vinyl flooring installation | from $1320 |
|
Additional Services & Permitting
|
|
| Post-installation maintenance advice | from $110 |
| Warranty and service agreement | from $165 |
| Disposal of construction waste | from $198 |
| Final inspection coordination | from $220 |
| Permit application and processing | from $385 |