Price for "Accessible Parking Construction in Tacoma, WA"
|
Project & Assessments
|
|
|---|---|
| Site survey and compliance assessment | from $270 |
| Cost estimation and budgeting | from $315 |
| Accessibility standards consulting | from $360 |
| Surveyor marking and boundary layout | from $360 |
| Permit application preparation | from $405 |
| Environmental impact evaluation | from $450 |
| Pre-construction feasibility study | from $495 |
| Traffic flow analysis for parking layout | from $540 |
| Soil testing and geotechnical report | from $630 |
| Architectural design planning for accessible parking | from $1350 |
|
Preparatory Works
|
|
| Material delivery and staging | from $450 |
| Temporary fencing and safety setup | from $540 |
| Utility marking and underground mapping | from $675 |
| Site clearing and debris removal | from $720 |
| Concrete formwork preparation | from $810 |
| Subgrade compaction and stabilization | from $990 |
| Erosion control and grading preparation | from $1080 |
| Drainage channel installation prep | from $1170 |
| Excavation for parking slab foundation | from $1350 |
|
Structural & Carpentry
|
|
| Sign post framing and mounting | from $765 |
| Installation of bollards and wheel stops | from $810 |
| Parking space layout marking and striping | from $1080 |
| Wheelchair landing platform installation | from $1440 |
| Accessible curb ramp construction | from $1620 |
| Concrete slab pouring and finishing | from $3150 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Installation of accessible parking signage with illumination | from $1170 |
| Electrical conduit installation for lighting | from $1350 |
| Underground drainage and plumbing setup | from $1530 |
| Lighting pole installation and wiring | from $1980 |
|
Finishes & Installations
|
|
| Reflective signage and decals application | from $630 |
| High visibility paint for curb and markings | from $810 |
| Weather-resistant protective coating | from $855 |
| Installation of tactile warning surfaces | from $990 |
| Seal coating and surface finishing | from $1260 |
|
Additional Services & Permitting
|
|
| Consultation on future accessibility upgrades | from $360 |
| Permit acquisition and processing fees | from $540 |
| ADA compliance documentation | from $585 |
| Post-construction site cleanup | from $630 |
| Final inspection and certification | from $720 |
| Warranty and maintenance service agreement | from $810 |
| Project management and supervision | from $1350 |