Price for "Penthouse Unit Construction in Tacoma, WA"
|
Project & Assessments
|
|
|---|---|
| Budget & timeline review | from $720 |
| Site survey & feasibility study | from $900 |
| Permit application assistance | from $900 |
| Energy efficiency modeling | from $1080 |
| Geotechnical report | from $1350 |
| Cost estimation & value engineering | from $1350 |
| Project management consultation | from $1620 |
| Environmental impact assessment | from $1800 |
| Structural engineering analysis | from $2700 |
| Architectural design & planning | from $3150 |
|
Preparatory Works
|
|
| Temporary utilities installation | from $1080 |
| Site fencing & security | from $1350 |
| Erosion control measures | from $1800 |
| Site clearing & debris removal | from $2250 |
| Access road setup | from $2520 |
| Shoring & bracing | from $2700 |
| Soil stabilization | from $3150 |
| Foundation preparation | from $3600 |
| Excavation & grading | from $4050 |
|
Structural & Carpentry
|
|
| Window & door framing | from $3600 |
| Floor framing & decking | from $5400 |
| Carpentry rough framing | from $5850 |
| Concrete foundation pouring | from $6300 |
| Exterior wall framing | from $6480 |
| Roof framing & sheathing | from $6750 |
| Load-bearing wall construction | from $7650 |
| Steel framing erection | from $10800 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Energy-efficient lighting setup | from $3600 |
| Smart home system integration | from $4500 |
| Fire sprinkler system installation | from $5400 |
| Plumbing rough-in & pipework | from $6300 |
| Electrical wiring & panel setup | from $7650 |
| HVAC system installation | from $8100 |
|
Finishes & Installations
|
|
| Window treatments & blinds | from $2250 |
| Built-in shelving & closets | from $3600 |
| Interior painting & trim work | from $4050 |
| Drywall installation & finishing | from $4950 |
| Flooring installation (hardwood/carpet) | from $5400 |
| Bathroom fixture installation | from $6300 |
| Kitchen cabinetry & countertops | from $10800 |
|
Additional Services & Permitting
|
|
| Lien release documentation | from $900 |
| Permit application & processing | from $1350 |
| As-built documentation | from $1530 |
| Warranty & post-construction services | from $1620 |
| Safety compliance auditing | from $1710 |
| Quality control inspections | from $1800 |
| Project closeout management | from $1980 |
| Final cleaning & waste removal | from $3150 |