Price for "Site Preparation Services in Tacoma, WA"
|
Project & Assessments
|
|
|---|---|
| Site survey and initial assessment | from $720 |
| Site feasibility study | from $810 |
| Construction risk evaluation | from $855 |
| Topographic mapping and stakeout | from $900 |
| Drainage assessment and planning | from $990 |
| Soil testing and analysis | from $1080 |
| Permitting and regulatory consultation | from $1080 |
| Hazardous material inspection | from $1170 |
| Geotechnical engineering report | from $1260 |
| Environmental impact assessment | from $1350 |
|
Preparatory Works
|
|
| Temporary fencing and security measures | from $1620 |
| Erosion and sediment control setup | from $1890 |
| Geotextile fabric installation | from $1980 |
| Water diversion and control | from $2250 |
| Soil stabilization and compaction | from $2430 |
| Selective demolition and debris haul-away | from $2520 |
| Temporary access road construction | from $2700 |
| Site grading preparation | from $2880 |
| Land clearing and vegetation removal | from $3150 |
| Rock breaking and removal | from $3600 |
|
Structural & Carpentry
|
|
| Temporary structural supports | from $3150 |
| Formwork and scaffolding setup | from $3330 |
| Site drainage structure installation | from $3600 |
| Heavy timber framing | from $3870 |
| Retaining wall construction | from $4050 |
| Shoring and underpinning | from $4320 |
| Steel reinforcement installation | from $4410 |
| Foundation excavation and trenching | from $4500 |
| Concrete pouring for slabs and pads | from $4680 |
| Precast concrete panel installation | from $5040 |
|
Mechanical, Electrical & Plumbing (MEP)
|
|
| Temporary water supply installation | from $3510 |
| Gas line installation and testing | from $3600 |
| Site electrical service setup | from $3780 |
| Industrial plumbing rough-in | from $3780 |
| Lighting system installation | from $3870 |
| Mechanical equipment foundation | from $3960 |
| Stormwater management system | from $4050 |
| Fuel and chemical containment systems | from $4140 |
| Power distribution and transformers | from $4230 |
| Sewer and septic system installation | from $4320 |
|
Finishes & Installations
|
|
| Site signage and safety barriers | from $1620 |
| Final site cleanup and debris removal | from $1710 |
| Dust control and suppression | from $1800 |
| Guardrails and bollard installation | from $1890 |
| Line striping and traffic control markings | from $1980 |
| Landscaping and soil restoration | from $2070 |
| Permanent fencing and gates | from $2160 |
| Irrigation system installation | from $2250 |
| Access ramps and stairs construction | from $2340 |
| Asphalt paving and concrete surfacing | from $4680 |
|
Additional Services & Permitting
|
|
| As-built documentation and reporting | from $1170 |
| Project scheduling and coordination | from $1260 |
| Emergency response planning | from $1260 |
| Site safety plan development | from $1350 |
| Noise and dust monitoring | from $1350 |
| Construction permits acquisition | from $1440 |
| Final approval and closeout services | from $1440 |
| Environmental compliance documentation | from $1530 |
| Inspection and quality control services | from $1620 |
| Waste disposal and recycling services | from $1800 |